4.5 Municipality of Campobasso
Year: 2000
Job order reference: 4.5
Client: Municipality of Campobasso
Contractor: COSTRUZIONI DONDI S.p.A.
Description: Concession for the Operation and Maintenance of the municipal sewage treatment plant of S. Stefano and the pumping station of Mascione district
3.156 Municipality of Campobasso
Year: 2000
Job order reference: 3.156
Client: Municipality of Campobasso
Contractor: COSTRUZIONI DONDI S.p.A.
Description: Operation and Maintenance of the sewage treatment plant of S. Stefano and the municipal pumping station Mascione in Campobasso
3.155 A.Q.P. S.p.A.
Year: 2000
Job order reference: 3.155
Client: A.Q.P. S.p.A.
Contractor: COSTRUZIONI DONDI S.p.A.
Description: Operation and Maintenance of the sewage treatmnet plant of Giovinazzo
3.154 REGIONE CALABRIA
Year: 2000
Job order reference: 3.154
Client: REGIONE CALABRIA
Contractor: COSTRUZIONI DONDI S.p.A. - I.B.I. S.r.l.
Description: Operation and Maintenance of the sewage treatment plant and of the pumping station of the drainage system in the territory of Calabria Region
3.153 Municipality of Campobasso
Year: 2000
Job order reference: 3.153
Client: Municipality of Campobasso
Contractor: COSTRUZIONI DONDI S.p.A.
Description: Tecnical Operation and Maintenance of the municipal sewage treatment plant of S. Pietro and Scarafone, Maintenance of the High tech electromechanical equipments
3.152 A.P.G.A. S.r.l.
Year: 2000
Job order reference: 3.152
Client: A.P.G.A. S.r.l.
Contractor: COSTRUZIONI DONDI S.p.A.
Description: Tecnical Operation and Maintenance of the plantnetworks APGA consisting the sewage treatment plant of Codevigo, Pontelongo and Cona
1.702 REGIONE CALABRIA
Year: 2000
Job order reference: 1.702
Client: REGIONE CALABRIA
Contractor: Joint Venture COSTRUZIONI DONDI S.p.A. (leader) and partners
Description: Renovation works at the Ionica coastline of Catanzaro - I phase
1.700 National Gas SAE
Year: 2000
Job order reference: 1.700
Client: National Gas SAE
Contractor: COSTRUZIONI DONDI S.p.A.
Description: Construction works of the natural-gas distribution network in the east area of Delta
1.698 Consorzio Servizi Pubblici Zemerghedo
Year: 2000
Job order reference: 1.698
Client: Consorzio Servizi Pubblici Zemerghedo
Contractor: COSTRUZIONI DONDI S.p.A.
Description: Maintenance works of municipla water mains, link execution in the Municipality of Montebello Vic. - Zemerghedo
1.697 VIGENZONE GAS S.r.l.
Year: 2000
Job order reference: 1.697
Client: VIGENZONE GAS S.r.l.
Contractor: COSTRUZIONI DONDI S.p.A.
Description: Maintenace and extension works of the methane gas distribution network of VIGENZONE GAS S.r.l.
1.694 Municipality of Campobasso
Year: 2000
Job order reference: 1.694
Client: Municipality of Campobasso
Contractor: COSTRUZIONI DONDI S.p.A.
Description: Technical operation and management of a period five years of the municipal sewage treatment plant of S. Pietro and Scarafone, extraordinary maintenance of the electromechanical devices